Kugler Engineering, GD House, Tallaght Business Park, Tallaght, Dublin 24
Clondalkin, Dublin
Cuthbert Condron Associates
Royal Liver
Elenco Engineering Limited
2002
7 Months
36
25
8.5
994
6,175
18
N/A
107
Indirect Gas
N/A
N/A
2
1
PROJECT DETAILS
Location
Consultant Engineers
Main Contractor
Mechanical Contractor
Year of Installation
Project Duration
TECHNICAL DATA
Length (m)
Width (m)
Height (m)
Floor Area (m²)
Volume (m³)
Winter Internal Design °C db
Summer Internal Design °C db
Heating Load (kW)
Heating Medium
Cooling Load (kW)
Cooling Medium
Supply Air Volume (m³/s)
Number of System