Kugler Engineering, GD House, Tallaght Business Park, Tallaght, Dublin 24
City
Chris Murphy and Associates
N/A
IIF
Winter '06/'07
5 Months
73
66
6.5
4,806
31,000
18
N/A
470 (full fresh air system)
Indirect Gas (with heat recovery)
N/A
N/A
17
2
PROJECT DETAILS
Location
Consultant Engineers
Main Contractor
Mechanical Contractor
Year of Installation
Project Duration
TECHNICAL DATA
Length (m)
Width (m)
Height (m)
Floor Area (m²)
Volume (m³)
Winter Internal Design °C db
Summer Internal Design °C db
Heating Load (kW)
Heating Medium
Cooling Load (kW)
Cooling Medium
Supply Air Volume (m³/s)
Number of System