Kugler Engineering, GD House, Tallaght Business Park, Tallaght, Dublin 24
Tallaght, Dublin
MacArdle McSweeney Associates
John Sisk & Son Limited
Temec Limited
Summer '04
5 Months
127
127
14
16,352
158,144
21
25
1,112
Indirect Gas
320 (Future)
CHW (Future)
21
4
PROJECT DETAILS
Location
Consultant Engineers
Main Contractor
Mechanical Contractor
Year of Installation
Project Duration
TECHNICAL DATA
Length (m)
Width (m)
Height (m)
Floor Area (m²)
Volume (m³)
Winter Internal Design °C db
Summer Internal Design °C db
Heating Load (kW)
Heating Medium
Cooling Load (kW)
Cooling Medium
Supply Air Volume (m³/s)
Number of System